📊 Latest Govt Interest Rates

As per Government of India (Ministry of Finance)
SSY (Sukanya) 8.2%
SCSS 8.2%
NSC 7.7%
KVP 7.5%
MIS 7.4%
PPF 7.1%

Small Savings Interest Rates India 2026 PPF NSC SSY SCSS Government schemes

New Feature

Click MARK AS FAVOURITE on any circular page/ Tool and find it anytime in the My Favourites tab in the main navigation bar.

📅 Calendars
Odia Typing
Latest updates
Maximize

Circulars

Official Odisha government circulars, notifications and department orders.

Public & education updates

Close

Latest Odisha schemes, examinations, admissions and public notices.

×

ODIA TYPING MACHINE

PAR ODISHA-SIMPLIFIED

Quick tools for Odisha Government Employees

Odisha Government Orders Immediate Repair and Restoration of Roads, Bridges & Culverts Damaged by Heavy Rain and Flood

Odisha Government Orders Immediate Repair and Restoration of Roads, Bridges & Culverts Damaged by Heavy Rain and Flood
Road Restoration Order Odisha

IMMEDIATE RESTORATION OF FLOOD-DAMAGED ROADS & BRIDGES

Rural Works Department, Government of Odisha – Order No. 28545301012026/RD
Order No. 28545301012026/RD
Issuing Authority Yamini Sarangi, IAS, Commissioner-cum-Secretary to Govt.
Department Rural Works Department, Odisha
Subject Immediate Repair/Restoration of Flood-Damaged Roads, Bridges & Culverts

Infrastructure Affected

Roads, Bridges, Culverts & CD Works
Damaged due to heavy rainfall & flood

Action Required

Immediate Repair & Restoration
As per prescribed code provisions

Reporting Requirement

Detailed Report with Geo-Tagged Photos
To be furnished to the Department

Key Provisions of the Order

  • Reports Received: Reports are being received from various Rural Works Divisions regarding damage/breaches to roads, bridges, culverts and other cross-drainage works due to heavy rainfall and flow of flood water resulting in disruption of traffic and inconvenience to the public.
  • Immediate Action: All concerned are instructed to take immediate steps for repair & restoration of the damaged roads and CD works under their jurisdiction, following the prescribed code provisions, to restore traffic movement as early as possible.
  • Monitoring: EICs are instructed to closely monitor the situation in vulnerable areas and ensure that necessary preventive as well as restoration measures are taken up promptly, wherever necessary, without compromising safety and quality.
  • Cautionary Measures: Adequate cautionary measures, including barricading, warning signs and traffic diversion arrangements, shall be provided at affected locations till normalcy is restored.
  • Reporting: A detailed report indicating the nature and extent of damage, restoration measures undertaken, along with geo-tagged photographs, shall be furnished to this Department for further course of action.
  • Issuing Authority: The order has been issued by Yamini Sarangi, IAS, Commissioner-cum-Secretary to Government, Rural Works Department, Odisha.
  • Addressees: The order is addressed to EIC-I, RW, Odisha, Bhubaneswar and EIC-II, RW, Odisha, Bhubaneswar.

Important Points to Note

  • Immediate Restoration: All damaged roads, bridges, culverts and CD works must be repaired immediately to restore traffic movement.
  • Code Provisions: Restoration works must follow the prescribed code provisions for quality and safety.
  • Vulnerable Areas: Close monitoring of vulnerable areas is required to prevent further damage.
  • Safety Measures: Barricading, warning signs, and traffic diversions must be provided at affected locations.
  • Geo-Tagged Photos: Detailed reports with geo-tagged photographs of damage and restoration measures must be submitted.
  • Traffic Disruption: The order aims to minimize inconvenience to the public caused by disrupted traffic.
  • Flood Damage: The order addresses damage caused by heavy rainfall and flood water flow across the state.

Frequently Asked Questions

What is the purpose of this order?
The order directs the immediate repair and restoration of roads, bridges, culverts and cross-drainage works damaged due to heavy rainfall and flood, to restore traffic movement and minimize public inconvenience.
Who has issued this order?
The order has been issued by Yamini Sarangi, IAS, Commissioner-cum-Secretary to Government, Rural Works Department, Odisha.
Which infrastructure is affected by the floods?
Reports indicate damage/breaches to roads, bridges, culverts and other cross-drainage (CD) works due to heavy rainfall and flood water flow.
What action is required from the concerned authorities?
Concerned authorities must take immediate steps for repair and restoration of damaged infrastructure following prescribed code provisions, and restore traffic movement as early as possible.
What safety measures should be provided at affected locations?
Adequate cautionary measures including barricading, warning signs, and traffic diversion arrangements shall be provided at affected locations till normalcy is restored.
What reporting is required after restoration?
A detailed report indicating the nature and extent of damage, restoration measures undertaken, along with geo-tagged photographs, shall be furnished to the Department.
Who are the addressees of this order?
The order is addressed to EIC-I, RW, Odisha, Bhubaneswar and EIC-II, RW, Odisha, Bhubaneswar.
Why is immediate restoration important?
Immediate restoration is important to restore traffic movement, prevent further damage, and minimize inconvenience to the public caused by disrupted road connectivity.